Home / Industries / Power & Energy
Industries · Power & EnergyLoad, grid and generator — tested to standard
From diesel gensets to grid-tied inverters and data-centre backup power — Langdi's intelligent load banks and test systems verify performance against GB/T 2820 and ISO 8528, in the factory or in the field.
The grid keeps changing the rules
Inverters meet weak grids
Grid-tied PV and storage inverters must ride through low-impedance networks and disconnect on islanding — both need dedicated test platforms to prove.
Data centres can't blink
Backup gensets and UPS chains are only as good as their last commissioning test — high-voltage RC loads make the test real.
Standards demand documentation
ISO 8528 and GB/T 2820 acceptance testing needs controlled load steps and complete records, not clip-on meters.
Generation, storage and the loads between
- Diesel & gas gensets — load acceptance, transient response and endurance per ISO 8528 / GB/T 2820.
- Grid-tied inverters — anti-islanding detection and weak-grid adaptive performance on precision RLC platforms.
- UPS & backup chains — data-centre commissioning with high-voltage resistive-capacitive loads.
- Marine power systems — propulsion-load simulation and shore-power compatibility verification.
- High-speed machines — turbomachinery and spindle motor stands from the motor bench family.
SCADA-grade supervision, bench-grade data
LDEV-X SCADA model
Live single-line dashboards, load-step sequencing and alarm supervision — the same suite that runs our test benches runs your power lab. About LDEV-X →
LDRT — fast transients
Deterministic control captures load-acceptance transients that slow supervisory systems miss. About LDRT →
OPC UA · Modbus · S7
Open industrial connectivity integrates load banks with your plant, BMS or building systems.
The intelligent load bank family
From the standard testbed catalogue:
| Stationary | High-power RLC dry-type · high-voltage RC for data centres · marine load banks. |
|---|---|
| Grid-compliance platforms | Anti-islanding detection · weak-grid simulation for inverter validation. |
| Rack & portable | 19-inch rack 2U–6U (air- or liquid-cooled) · portable multi-unit-parallel · wall-mounted vehicle-integrated · mobile field units. |
| Test systems | Computer-controlled generator test per GB/T 2820 / ISO 8528 · production-line online generator test with one-click operation. |